Year Built: 2009
Design Team: Hodgson Schilf Architects Inc
Construction Team: Ledcor Construction
Status: For Lease
Phase 2 was added to the existing Phase 1 building and features many of the same design elements that resulted in the success of Phase 1. Phase 2 also features a dramatic glass enclosed entrance and even more windows and natural light than Phase I.
Phase 2 is currently for lease. Inquires can be directly sent to our leasing agent:
Chad Brennand, CCIM, BComm
DTZ Barnicke
780-641-0830